乐博体育平台app

ENGINEERING
2 x 240m2 sintering waste heat boiler project of a company
The waste heat from the high temperature waste gas of the sintering machine and the cooling machine is recycled, and the low-pressure steam is produced by the waste heat boiler to generate electricity from the turbogenerator. The outlet of the boiler high-pressure steam flow is more than 32 t/h; low-pressure steam flow is greater than or equal to 6.5 t/h. The process can ensure a high exhaust gas temperature, and exhaust gas-recycling component of the two section of the annular cooler; the impact on the cooling function and efficiency is minimal.
XML 地图